When this homeowner in Shelton, CT called us, their shower, installed by a previous contractor, had started leaking. On the surface, the tile looked fine. Behind it, water was finding its way into the wall, which is exactly how mold, rotted framing, and expensive repairs begin.

Our job was to fix it the right way: tear it out, waterproof it correctly, and give the homeowner a brand-new shower they never have to worry about. We completed the entire project in 4 days.

Before: the original shower, which was leaking behind the tile.

Why the Original Shower Was Leaking

Tile and grout are not waterproof on their own. Both are porous, so every shower depends on what is installed behind the tile to keep water out of the walls. When that layer is skipped, installed incorrectly, or not sealed at the seams, corners, and fixtures, water slowly works its way through. That is what we found here.

Leaks like this rarely fix themselves, and patching grout or caulking only hides the problem. The only lasting solution is to remove the tile and rebuild the waterproofing from the studs out.

How We Rebuilt It

  • Full tear-out of the old tile, walls, and the acrylic shower base down to the framing.
  • Schluter waterproofing system installed on the walls and floor, with every seam, corner, niche, and plumbing penetration sealed.
  • Properly sloped tiled shower floor to a square stainless drain, replacing the old acrylic pan.
  • Large format marble-look porcelain on the walls for a clean, high-end look with fewer grout lines.
  • Hexagon marble-look mosaic on the shower floor for slip resistance and a classic finish.
  • Long recessed shampoo niche with a matching hex mosaic back.
  • Built-in shower bench with a solid stone top and matching curb cap.
  • Ceiling-mounted rain shower head alongside a handheld slide bar.
After: large format porcelain walls, rain shower head, and built-in bench.
The built-in bench and long recessed niche with a hexagon accent.
New hexagon mosaic shower floor, sloped to a square drain.

How We Finished in Just 4 Days

Most homeowners are told a shower rebuild takes weeks. We finished this one in four days because tile and waterproofing are all we do. Every step is planned before we start, materials are on site, and our crew isn’t juggling other trades. That means less disruption for you without cutting a single corner. Learn more about our shower builds and waterproofing.

Frequently Asked Questions

How do I know if my tile shower is leaking?

Common signs include stains or soft spots on the ceiling below the bathroom, loose or cracked tiles, grout that stays dark long after a shower, a musty smell, or peeling paint on the wall outside the shower.

Can a leaking shower be fixed without tearing it out?

If the leak is from a failed grout line or caulk joint, sometimes. But if water is getting past the tile because the waterproofing behind it is missing or failed, the only reliable fix is to remove the tile and rebuild the waterproofing correctly.

How long does it take to rebuild a shower?

Precision Tile typically completes a full shower rebuild, including demolition, waterproofing, and new tile, in about 4 days.

Do you fix showers installed by other contractors?

Yes. Correcting failed waterproofing and other contractors’ mistakes is a large part of what we do across New Haven County and Fairfield County.